the maintenance of taihang heyida kiln in baoding was highly-百家乐凯发k8

project news

the maintenance of taihang heyida kiln in baoding was highly

发布于2020-09-03 17:03 点击:次
      baoding taihang heyi kiln system maintenance project is the first large single maintenance project in our company's maintenance plate this year. previously, the operation of taihang heyi kiln has been abnormal, the kiln barrel swing is large, and the kiln cylinder up and down, supporting wheel, hydraulic block wheel and other parts have problems, so the production of the kiln can not go up. through this overhaul, all the above problems have been solved, and the kiln system operates normally at full load for a long time. the overhaul was highly appraised and recognized by the owner.

    
overhaul of baoding taihang heyi kiln system - replacement of tugboat and big gear ring (january 2020)

overhaul of baoding taihang heyi kiln system - kiln shell replacement (january 2020)
网站地图