argentina technical services project begins
发布于2018-12-27 11:26
点击:次
argentina lamali line 2 5800 tpd cement production line project is located in argentina, buenos aires, olavarria, camino real a 16 de julio s/n, paraje la pampita. b7463 cga. we dispatch qualified technical teams to provide professional technical guidance services to assist party a in the installation, construction, commissioning and performance evaluation of the argentina l'amali line 25800tpd project production line contracted by party a.
![](/uploads/image/u181227/1-1q22g12rq18.png)
no. 3 kiln pier (top support)
![](/uploads/image/u181227/1-1q22g12u0n1.png)
clinker warehouse (sliding form construction)
![](/uploads/image/u181227/1-1q22g12zu34.png)
tower, kiln pier foundation (with acceptance)
connection point with old line
![](/uploads/image/u181227/1-1q22g12950b6.png)
preheater tower concrete structure (top concrete completed pouring)
![](/uploads/image/u181227/1-1q22g13011126.png)
55t crawler crane assembly completed